Progress arrives in a voice note
Keep the audio source beside a prepared transcript when transcription is available.
Construction site reporting, from field source to PM review
Rangka organises what the site team reports through Telegram into one project day, shows what is still unclear, and keeps the source available when the PM needs to check it.
“Slab reinforcement is about 70% complete. The M&E sleeve check is still pending.”
Voice note + 2 site photosThe daily problem
When progress, photographs and the reason for a delay arrive at different times, the PM still has to reconstruct the story. The record should assemble around the work—not around the order somebody opens the chat.
Keep the audio source beside a prepared transcript when transcription is available.
Connect the images to the same reported activity and project date.
Keep the missing detail visible instead of filling it with an assumption.
A different worked project example
This illustrative Grid B2 record uses the same source set as the homepage Site Pulse.
Six of eight pipe supports installed; two await anchor bolts.
Original audio retained with a prepared transcript.
Two images connected to the reported location and work.
How the workflow works
Rangka groups related submissions, prepares supported fields, and sends the interpretation to the PM—not straight into the official record.
Link one Telegram group to the project and assign the people who report from site.
Text, voice notes, photographs, documents, and videos enter the chronological source record.
The PM checks the source, corrects the prepared update, and decides the next project action.
Where human judgement remains
Rangka cannot know about an event that was never reported. It helps the PM see submitted work and gaps sooner; it does not replace field verification or professional judgment.
Questions before you start
No. Normal field reporting continues through the linked Telegram group.
Yes, when the source was reported and retained in the project record.
The PM can correct, exclude, reject, or request clarification before approval.
Start with your first active project.
Your PM stays responsible for every approved record.